top of page
Establishing Control Limits

In the realm of Lean Six Sigma, Statistical Process Control (SPC) stands as a pivotal methodology for monitoring and controlling a process through the use of statistical methods. Among its various tools, control charts emerge as fundamental instruments, designed to visually track process performance over time. The essence of these charts lies in their ability to distinguish between normal process variation and variation signaling a need for process improvement. This article delves into the core aspect of control charts: the establishment of control limits, which are crucial for the effective analysis and management of process capabilities.


Understanding Control Limits

Control limits are statistically derived boundaries set around the process average in a control chart. They mark the threshold at which a process is considered to be statistically 'in control' or 'out of control.' These limits encompass three main types: the Upper Control Limit (UCL), the Lower Control Limit (LCL), and the Center Line (CL), which typically represents the process mean.

The calculation and setting of these limits are not arbitrary but are based on the inherent variability of the process data, often determined by the process's historical performance. It's vital to note that control limits differ from specification limits, which are defined by customer requirements. Control limits focus on the process's capability to produce output within expected variability bounds, not on meeting specific customer expectations.


Theoretical Foundation for Control Limits

Control limits are grounded in the principles of probability and the distribution of data. Assuming a process follows a normal distribution, control limits are usually set at ±3 standard deviations from the process mean. This setting implies that, under normal process variation, 99.73% of all data points should fall within the control limits. Any point outside these limits suggests a special cause of variation, signaling that the process may be out of control.


Construction of Control Limits

  1. Calculate the Process Mean (CL): The first step involves determining the average of your process data. This average becomes the Center Line (CL) on your control chart.

  2. Determine the Standard Deviation (σ): Calculate the standard deviation of your process data, which measures the variability within your process.

  3. Set the Control Limits:

    • Upper Control Limit (UCL) = CL + 3σ

    • Lower Control Limit (LCL) = CL - 3σ

These calculations are based on the assumption of normality in the process data distribution. For processes not following a normal distribution, transformation techniques or non-parametric methods may be required to accurately set control limits.


Adjusting Control Limits

Control limits should not remain static. As process improvements are implemented or changes occur, reevaluation of control limits is essential to ensure they accurately reflect the current state of the process. This dynamic adjustment helps maintain the relevance and effectiveness of SPC efforts in driving process improvement.

Practical Considerations

While the theory behind establishing control limits is straightforward, practical application requires attention to detail and understanding of the process context:

  • Ensure adequate data collection: Accurate control limits depend on reliable and sufficient process data.

  • Distinguish between common and special cause variations: Properly established control limits help identify outliers caused by special circumstances, guiding targeted improvement efforts.

  • Avoid overreacting to common cause variation: Not all points outside the control limits indicate a process change. Statistical anomalies can occur, and knee-jerk reactions can lead to unnecessary process adjustments.


Conclusion

Establishing control limits in SPC is a fundamental step in leveraging control charts for process monitoring and improvement. By understanding and applying these limits within the context of Lean Six Sigma methodologies, organizations can enhance their ability to identify, analyze, and reduce variability in their processes. This not only leads to improved process control but also to significant gains in quality, efficiency, and customer satisfaction, embodying the core goals of Lean Six Sigma initiatives.

Curent Location

/412

Article

Rank:

Establishing Control Limits

395

Section:

LSS_BoK_5.2 - Statistical Process Control (SPC)

B) Control Charts: Theory and Construction

Sub Section:

Previous article:

Next article:

bottom of page