top of page
Steps to Implement Control Charts

Implementing control charts in processes is a crucial step in Six Sigma methodologies, aimed at monitoring, controlling, and improving process performance over time. Control charts are graphical tools that depict how a process changes over time, with data plotted in time order. They help identify trends, shifts, or any variations in the process that may require correction. Below are the steps to effectively implement control charts in processes, ensuring continuous quality improvement and operational excellence.

1. Determine the Purpose of the Control Chart

Before implementing a control chart, it's essential to identify the specific process or quality characteristic that needs to be monitored. This step involves understanding the goals of process monitoring, such as reducing variability, ensuring process stability, or identifying areas for improvement. Clearly defining the purpose will guide the selection of the appropriate type of control chart.

2. Select the Process to be Monitored

Choose a critical process or a phase of the process that significantly impacts the overall quality of the product or service. The selection should be based on historical data, customer feedback, or areas known for variability and defects. It's vital to focus on processes that are stable and have predictable patterns of behavior.

3. Collect Data

Data collection is a foundational step in implementing control charts. Determine the type of data needed (continuous or attribute data) and establish a data collection plan that specifies how data will be gathered, who will collect it, and at what frequency. It's important to collect a sufficient amount of data to establish a reliable baseline for the process performance.

4. Select the Right Type of Control Chart

There are several types of control charts, each suited for different types of data and objectives. For continuous data, common charts include the Individual-Moving Range (I-MR) chart, X-bar and R chart, or X-bar and S chart. For attribute data, options include the P-chart (proportion chart) or the U-chart (defects per unit chart). Choose the chart that best matches the data type and monitoring objectives.

5. Establish Control Limits

Control limits are statistical boundaries that define the acceptable range of variation in a process. These limits are calculated based on the collected data and represent the threshold for normal process variation. Any data point that falls outside of these limits indicates an unusual variation that may require investigation.


6. Plot the Data and Interpret the Chart

Once control limits are established, plot the collected data on the control chart. Regularly updating the chart with new data points will provide a visual representation of the process performance over time. Analyze the chart for patterns, trends, or points outside the control limits, which may indicate process changes or areas for improvement.

7. Investigate and Take Corrective Actions

If the control chart signals an out-of-control condition, investigate the cause of the variation. This may involve analyzing the process, machinery, materials, or human factors contributing to the anomaly. Once the root cause is identified, implement corrective actions to bring the process back into control.

8. Monitor the Process Continuously

Implementing control charts is not a one-time activity but an ongoing process of monitoring and improvement. Continuously collect and plot data, review the control charts for new signals, and refine the process as needed. This continuous monitoring ensures the process remains stable and improvements are sustained over time.


9. Train and Involve the Team

For control charts to be effective, it's crucial to involve and train the team responsible for the process. Ensure they understand how to read and interpret control charts, recognize out-of-control conditions, and are empowered to take corrective actions. This fosters a culture of quality and continuous improvement within the organization.


10. Review and Adjust the Control Chart as Necessary

Over time, as process improvements are made or changes in the production environment occur, it may be necessary to review and adjust the control charts. This could involve recalculating control limits, changing the type of control chart, or modifying the data collection method to better reflect the current state of the process.


Implementing control charts is a systematic approach to achieving higher levels of process control and quality. By following these steps, organizations can identify process variations early, implement timely corrective actions, and drive continuous improvement efforts, aligning with the core principles of Lean Six Sigma.

Video



Curent Location

/412

Article

Rank:

Steps to Implement Control Charts

407

Section:

LSS_BoK_5.2 - Statistical Process Control (SPC)

C) Implementing Control Charts in Processes

Sub Section:

Previous article:

Next article:

bottom of page